SAPE STEEL made the 3D-Modelling , and workshop drawings of this structure within 4 month. This Power-Plant located in Belgium with weight about 1500Tons made of steel structures. 3 weeks after start of the project the manufacturing started and continued parallel to the manufacturing and montage.
Martin Luther King,Jr
SAPE STEEL was Detail Designer of this Unique project according to the EN codes of Europe.
Date: September 2019
Location: Belgium, Wielsbeke
Function: Green Power plant
Energy: Produce 45 MWe