SAPE STEEL made the 3D-Modelling , and workshop drawings of this structure within 4 month. This Power-Plant located in Belgium with weight about 1500Tons made of steel structures. 3 weeks after start of the project the manufacturing started and continued parallel to the manufacturing and montage.
"Out of the mountain of despair, a stone of hope."